by winston » Wed Jul 09, 2008 5:23 pm
Not vested.
BOUSTEAD SUBSIDIARY AWARDED S$67M CONTRACT TO DESIGN-AND-BUILD SEMICONDUCTOR EQUIPMENT MANUFACTURING FACILITY EARMARKED FOR GREEN MARK PLATINUM AWARD
Singapore, 9 July 2008
Boustead Singapore Limited (“Boustead†or the “Companyâ€) is pleased to announce that its 91.7%-owned subsidiary, Boustead Projects Pte Ltd (“Boustead Projectsâ€) – a leading specialist in industrial real estate solutions – has been awarded a S$67 million contract to design-and-build an integrated semiconductor equipment manufacturing, warehouse and office facility (the “Facilityâ€) for a global Fortune 500 Company (the “Clientâ€).
With a gross floor area of 32,000 square metres over five floors, the Facility will play a key role in the Client’s expansion of its global semiconductor equipment manufacturing business. The Facility is expected to be completed in 3Q 2009 on Boustead Projects’ fast-track programme.
Incorporating the latest features in energy and water efficiency, and environmental quality and sustainability, the Facility’s design allows for the future installation of a solar energy harvesting system. An integrated photovoltaic system generating approximately 300 kWp has been proposed for the Facility.
The Facility aims to achieve the Green Mark Platinum Award, which will be the first of its kind in the heavy industry category. Under the BCA Green Mark Scheme, the Green Mark Platinum Award is the highest award for environmental sustainability in buildings.
Mr Wong Fong Fui, Chairman and Group Chief Executive Officer of Boustead said, “We are delighted to have been awarded this sizeable contract from a prestigious multinational corporation with a global presence. This contract demonstrates Boustead Projects’ excellent track record in customising industrial real estate solutions for multinational corporations.
Together with the S$60 million The Singapore FreePort and the S$37 million Singapore Aero Engine Services MRO facility which were both secured recently, this contract sets Boustead Projects on the path to another excellent year.â€
Mr Hooi Ka Cheong, Managing Director of Boustead Projects said, “We would like to thank our client for giving us the opportunity to deliver this landmark development. We have designed this facility to attain Green Mark Platinum, a distinction which is unheard of in the heavy industry category. It will be an important step in the right direction for the construction industry and Singapore as a whole.â€
The above contract is expected to have a positive material impact on the profitability and earnings per share of the Company in the current financial year ending 31 March 2009. However, the contract is not expected to have a material impact on the net asset value per share in the current financial year.
It's all about "how much you made when you were right" & "how little you lost when you were wrong"